Accessory dwellings
10 published plans, $147,000 to $388,000, turn-key on a standard lot. The plan, the size and the figure are on the page before anyone calls.
The catalogueAccessory dwellings, new houses and the site work underneath them, across southern Maine, the New Hampshire Lakes Region and the Seacoast. The company has been building here since 2018, based at 621 Wakefield Road.
A backyard home or a new house is two jobs that have to agree with each other: the ground, and the building that sits on it. When those are bought from two different companies, the seam between them is where the schedule slips and the budget moves.
Here they are the same contract. The excavation, the grading, the foundation preparation, the utility trenching and the septic are carried out by the crew that starts the job. Plumbing, electrical and the other licensed specialties are scheduled as part of the build, so there is one programme and one invoice path rather than a list of numbers to chase.
That does not mean every trade on a Langone site is on the payroll, and the site has never claimed it. It means the responsibility for the whole of it sits in one place.
Site work is quoted with the building, not after it, which is why the published ADU figures from $147,000 to $388,000 are turn-key on a standard lot.
Your dates do not depend on a rental yard or on another contractor finishing elsewhere first.
The first consult is taken by the owner, and the same team stays with the project from start to finish.
If the ground, the ordinance or the septic design is going to move a number, you hear it while it can still change a decision.
10 published plans, $147,000 to $388,000, turn-key on a standard lot. The plan, the size and the figure are on the page before anyone calls.
The catalogueNew construction and major additions from $325 per square foot, land separate. Fully custom work, outside the standard brands and finishes, is usually built on cost-plus.
How a house is pricedLand clearing, excavation, drainage, septic and utility trenching taken on as their own job, for an owner or for another builder. Stormwater and exposed soil are part of the site plan, and the erosion controls are held on the job.
Site workNothing here is unusual. It is written down so that you know what the next step is at every stage, and so that nobody has to guess what was agreed.
A conversation about the property and what you want on it. If the lot will not carry it, that is the point at which you should hear so, not three months later.
Permits, the site plan, the septic design, the utility runs, and a number you can take to a lender. Erosion controls are written into the plan at this stage rather than improvised on site.
Site work first, then the building. There is an update every week, a single schedule, and a job site kept tidy between visits.
Walk-through, punch list, keys. Permits, utilities and the lot decide the dates, so no completion date is promised that cannot be held.
Southern Maine: Sanford, Alfred, Limerick, Shapleigh, Acton, Waterboro, Newfield, the Kennebunks and Wells. The New Hampshire Lakes Region: Meredith, Gilford, Wolfeboro, Ossipee, Alton and Laconia. The Seacoast: Portsmouth, Exeter, Hampton, Rochester and Dover.
If your town is not on the service-area pages, it is worth a call either way. The answer is a straight yes or no rather than a maybe.
A certificate of insurance is available on request. Limits and bond amounts are not published on this page.
Southern Maine, the NH Lakes Region, and the NH Seacoast.