ADUs in Shapleigh
The catalog has a model named The Shapleigh: 800 sq ft, two bedrooms, one bath. The Newfield is 600 sq ft on one floor. The Bean is the smallest plan. The ordinance still decides the lot.
Price a Shapleigh ADUShapleigh is the next town over from Newfield. Mousam Lake and Square Pond sit here and in Acton. Langone Site Services builds turn-key ADUs there and handles excavation, site work, and septic. The catalog includes a model named The Shapleigh at $252,000, but a name on a model is not a permit. Call (978) 987-0089.
Shapleigh follows LD 2003. Shoreland setbacks on Mousam Lake and Square Pond depend on your lot, and we'll check yours.
Shapleigh sits next to Newfield. Mousam Lake and Square Pond are here and in Acton. A shore lot and an inland lot toward Newfield aren't the same dig. LD 2003 is the state ADU rule.
Mousam Lake, Square Pond, and an inland Shapleigh lot toward Newfield do not share one setback. We'll read the shoreland line on your lot.
The namesake plan, the 600 sq ft Newfield, and the smallest plan are the three we open with. Larger plans wait on the lot and the ordinance.
384 sq ft, 1 bed / 1 bath, 16×24, one story.
View this model600 sq ft, 1 bed / 1 bath, 30×20, one story.
View this model800 sq ft, 2 bed / 1 bath, 40×20, one story.
View this modelThe catalog has a model named The Shapleigh: 800 sq ft, two bedrooms, one bath. The Newfield is 600 sq ft on one floor. The Bean is the smallest plan. The ordinance still decides the lot.
Price a Shapleigh ADUThe tight digs are the shore roads. Inland ground toward Newfield is easier. The crew leaves from next door.
ExcavationShapleigh septic is a Mousam Lake or Square Pond system, or an inland lot toward Newfield. Pond systems and inland systems both start from a design from $700 and $18,000 conventional price.
Septic installationShapleigh site work is shore roads on Mousam and Square Pond, or an easier inland pad toward Newfield. A plan named The Shapleigh still needs a Shapleigh permit.
Site workEvery town we cover is listed on the service area page.
We will read the ordinance against your parcel, look at what the ground will take for septic and access, and come back to you with a figure rather than a range.