ADUs in Limerick
A shore lot and an inland lot want different footprints. The Summit is 654 sq ft. Ella's Retreat is 981 sq ft. The Ossipee is 1,049 sq ft with a 2-car garage. The ordinance decides which one the lot can hold.
Price a Limerick ADULimerick borders Newfield. Routes 5, 11, and 160 run through town, and part of Lake Arrowhead sits here and in Waterboro. Langone Site Services builds turn-key ADUs there and handles excavation, site work, and septic. Models run from $147,000 to $388,000. Call (978) 987-0089.
Limerick follows LD 2003. Shoreland rules matter on Lake Arrowhead and the Little Ossipee. Inland lots on Routes 5, 11, and 160 are a different job.
Lake Arrowhead is a reservoir on the Little Ossipee River, and the village sits back from that water. Shoreland rules apply at the lake. Inland ground is a different dig. LD 2003 is the Maine ADU rule.
Lake Arrowhead shoreland and a Limerick lot back in the village are different setbacks. We'll check the district before anyone stakes it.
The Summit at 654 sq ft, Ella's Retreat at 981, and The Ossipee at 1,049 with a 2-car garage. A Lake Arrowhead lot can rule the bigger ones out.
654 sq ft, 1 bed / 1 bath, 30×22, one story.
View this model981 sq ft, 2 bed / 2 bath, 36×28, one story.
View this model1,049 sq ft, 2 bed / 1 bath, 38×28, two story plus a 2-car garage.
View this modelA shore lot and an inland lot want different footprints. The Summit is 654 sq ft. Ella's Retreat is 981 sq ft. The Ossipee is 1,049 sq ft with a 2-car garage. The ordinance decides which one the lot can hold.
Price a Limerick ADUThe water roads are tight. The inland ground is more open.
ExcavationLimerick septic is a Lake Arrowhead question and a separate question on the inland lots along Routes 5 and 11. Arrowhead systems and inland systems both use a design from $700 and the $18,000 conventional start.
Septic installationLimerick site work splits between Lake Arrowhead camp roads and more open lots on Routes 5, 11, and 160.
Site workEvery town we cover is listed on the service area page.
We will read the ordinance against your parcel, look at what the ground will take for septic and access, and come back to you with a figure rather than a range.