No fixed week count
We do not promise that an ADU will finish in a set number of weeks. A ready site with utilities at the line and permits in hand moves differently than a lot that still needs septic design, ledge work, or a town review.
What usually changes the schedule
- Permits. Work cannot start while an application is sitting with the town.
- Weather. A bad stretch can pause excavation.
- Design changes after permits are issued.
- Long utility runs when water, power, or septic are not already at the property line.